Summary
The customer needed two gas-lift king single beds put together at their home in New Lynn, Auckland and was flexible about timing. They had a drill and other tools on hand, which made it straightforward to work with the supplied components. Initial messages clarified that these were gas-lift king single frames and that budget was a consideration. Two offers came in for the job and, after a brief negotiation, the selected offer of $50 was accepted. The agreed outcome was to assemble both beds from the available parts, and the work progressed directly from acceptance to on-site assembly. Everything was put together as requested and the job was completed successfully. A 5-star tasker rating was shown on the profile, though no written review text was provided.
Final Cost
50
Completed on
12 Mar 2025
Location
Auckland
Completed by
Brady
New Lynn, Auckland 0600, New Zealand
Customer Rating
Rated by Sonia •
#21236
• Assembly Services
Based in New Lynn. Flexible with anytime. I have drill and tools available.